2.0 KiB
2.0 KiB
Bathroom Renovation
Started: 2026-03-07 Status: Planning
Current State
Describe what the bathroom looks like now: dimensions, fixtures, materials, condition.
- Dimensions: TODO (L x W in cm/m)
- Ceiling height: TODO
- Current flooring: TODO
- Current wall finish: TODO
- Fixtures:
- Toilet: TODO (type, condition)
- Sink/vanity: TODO
- Shower / bathtub: TODO
- Mirror/cabinet: TODO
- Plumbing location: TODO (which wall carries the supply/drain lines)
- Ventilation: TODO (extractor fan?)
- Electrical: TODO (outlets, lighting, heated floor)
Goals / Requirements
What should the new bathroom achieve?
- TODO — e.g., walk-in shower instead of bathtub
- TODO — e.g., double sink
- TODO — e.g., heated floor
- TODO — e.g., specific style/aesthetic
Blueprint
Materials & Finishes
| Element | Choice | Supplier / Link | Price |
|---|---|---|---|
| Floor tiles | |||
| Wall tiles | |||
| Shower screen | |||
| Toilet | |||
| Sink / vanity | |||
| Faucets | |||
| Mirror / cabinet | |||
| Lighting | |||
| Paint / other |
Budget
| Category | Estimated | Actual |
|---|---|---|
| Materials | ||
| Labour | ||
| Plumbing | ||
| Electrical | ||
| Unexpected / contingency (15%) | ||
| Total |
Contractor / DIY Plan
- DIY: list tasks you handle yourself
- Professional: list tasks that need a contractor
- Contacts:
- Plumber: name, phone
- Electrician: name, phone
- Tiler: name, phone
Timeline
| Phase | Target Date | Done |
|---|---|---|
| Planning & design | ||
| Demolition | ||
| Plumbing rough-in | ||
| Electrical rough-in | ||
| Waterproofing | ||
| Tiling | ||
| Fixture installation | ||
| Finishing touches |
Notes
Reference / Inspiration
Links, photos, or ideas collected.