vault backup: 2026-03-07 12:18:28

This commit is contained in:
Vincent Verbruggen
2026-03-07 12:18:28 +01:00
parent 59d2fe286f
commit 4fecbbc05c
3 changed files with 33 additions and 14 deletions

View File

@@ -152,6 +152,12 @@
<text text-anchor="middle" dominant-baseline="central" font-size="45" fill="#666">Sink</text>
</g>
<!-- Mirror light: 560mm, 60mm from wall E, on wall F above sink -->
<rect x="25" y="60" width="80" height="560" rx="10" fill="none" stroke="#f5a623" stroke-width="5"/>
<g transform="translate(160, 340) scale(1,-1)">
<text text-anchor="start" dominant-baseline="central" font-size="30" fill="#f5a623">Mirror 560mm</text>
</g>
<!-- Shelf: wall A, 800mm long, 250mm deep, 500mm from wall F -->
<rect x="500" y="calc(2600 - 250)" width="800" height="250" fill="#c8b896" fill-opacity="0.3"
stroke="#999" stroke-width="5" />
@@ -167,11 +173,11 @@
<text text-anchor="middle" dominant-baseline="central" font-size="35" fill="#f5a623">Light (420mm)</text>
</g>
<!-- Vent: on wall D, centered on radiator (y=900) -->
<rect x="1400" y="850" width="100" height="100" fill="none" stroke="#888" stroke-width="5" stroke-dasharray="15,8"/>
<line x1="1400" y1="850" x2="1500" y2="950" stroke="#888" stroke-width="3"/>
<line x1="1500" y1="850" x2="1400" y2="950" stroke="#888" stroke-width="3"/>
<g transform="translate(1350, 900) scale(1,-1)">
<!-- Vent: on wall D, 200mm wide, 750mm from wall E -->
<rect x="1400" y="750" width="100" height="200" fill="none" stroke="#888" stroke-width="5" stroke-dasharray="15,8"/>
<line x1="1400" y1="750" x2="1500" y2="950" stroke="#888" stroke-width="3"/>
<line x1="1500" y1="750" x2="1400" y2="950" stroke="#888" stroke-width="3"/>
<g transform="translate(1350, 850) scale(1,-1)">
<text text-anchor="end" dominant-baseline="central" font-size="35" fill="#888">Vent</text>
</g>

Before

Width:  |  Height:  |  Size: 13 KiB

After

Width:  |  Height:  |  Size: 13 KiB

View File

@@ -162,6 +162,12 @@
<text text-anchor="middle" dominant-baseline="central" font-size="32" fill="#666">550x350</text>
</g>
<!-- Mirror light: 560mm, 60mm from wall E, on wall F above sink -->
<rect x="25" y="60" width="80" height="560" rx="10" fill="none" stroke="#f5a623" stroke-width="5"/>
<g transform="translate(160, 340) scale(1,-1)">
<text text-anchor="start" dominant-baseline="central" font-size="30" fill="#f5a623">Mirror 560mm</text>
</g>
<!-- Shelf: wall A, 800mm long, 250mm deep, 500mm from wall F -->
<rect x="500" y="calc(2600 - 250)" width="800" height="250" fill="#c8b896" fill-opacity="0.3"
stroke="#999" stroke-width="5" />
@@ -177,11 +183,11 @@
<text text-anchor="middle" dominant-baseline="central" font-size="35" fill="#f5a623">Light (420mm)</text>
</g>
<!-- Vent: on wall D, centered on radiator (y=900) -->
<rect x="1400" y="850" width="100" height="100" fill="none" stroke="#888" stroke-width="5" stroke-dasharray="15,8"/>
<line x1="1400" y1="850" x2="1500" y2="950" stroke="#888" stroke-width="3"/>
<line x1="1500" y1="850" x2="1400" y2="950" stroke="#888" stroke-width="3"/>
<g transform="translate(1350, 900) scale(1,-1)">
<!-- Vent: on wall D, 200mm wide, 750mm from wall E -->
<rect x="1400" y="750" width="100" height="200" fill="none" stroke="#888" stroke-width="5" stroke-dasharray="15,8"/>
<line x1="1400" y1="750" x2="1500" y2="950" stroke="#888" stroke-width="3"/>
<line x1="1500" y1="750" x2="1400" y2="950" stroke="#888" stroke-width="3"/>
<g transform="translate(1350, 850) scale(1,-1)">
<text text-anchor="end" dominant-baseline="central" font-size="35" fill="#888">Vent</text>
</g>

Before

Width:  |  Height:  |  Size: 13 KiB

After

Width:  |  Height:  |  Size: 14 KiB

View File

@@ -20,12 +20,13 @@ Describe what the bathroom looks like now: dimensions, fixtures, materials, cond
- Bathtub (planned): freestanding corner bath ~1800x800 (no brick surround)
- Mirror: large mirror with diffuse ring light (keeping)
- Shelf: wall A, 800mm long, 250mm deep, 500mm from wall F — want to keep something similar here (visual break, not necessarily storage)
- Shower mirror: ~300mm small mirror in the shower for shaving — want to keep this in the future bathroom. Suction cup mount is probably best (removable, no drilling). See [bol.com scheerspiegels](https://www.bol.com/nl/nl/l/scheerspiegels/22845/)
- Sink-side storage: two [IKEA TISKEN suction cup baskets](https://www.ikea.com/nl/nl/p/tisken-mand-met-zuignap-zwart-90498528/) on wall F next to sink — functional but need a nicer replacement
- **Plumbing location:** shower water on wall B, bath water on wall F
- **Ventilation:** vent on wall D (centered on radiator, no window). Connected to whole-house mechanical ventilation — single motor just behind the opening. Currently always open, causing heat loss.
- **Ventilation:** vent on wall D, 200mm wide, 750mm from wall E (no window). Connected to whole-house mechanical ventilation — single motor just behind the opening. Currently always open, causing heat loss.
- **Electrical:**
- Ceiling: [Philips Hue Devere](https://www.philips-hue.com/nl-nl/p/hue-white-ambiance-devere-grote-plafondlamp/4116631P6#specifications) — 420mm, 1100mm from wall F, 700mm from wall A (keeping)
- Mirror: [Philips Hue Adore](https://www.philips-hue.com/nl-nl/p/hue-white-ambiance-adore-badkamerspiegel-met-verlichting/8719514340992) — bathroom mirror with integrated light (keeping)
- Mirror: [Philips Hue Adore](https://www.philips-hue.com/nl-nl/p/hue-white-ambiance-adore-badkamerspiegel-met-verlichting/8719514340992) — 560mm wide, 60mm from wall E, above sink (keeping)
- **Heating:** towel rail radiator on wall D, 600mm wide, 600mm from door — needs replacing. Tado smart heating system with pre-heat scheduling.
---
@@ -57,12 +58,15 @@ What should the new bathroom achieve?
|---------|--------|-----------------|-------|
| Floor tiles | | | |
| Wall tiles | | | |
| Shower tray | [Maxaro 100x100cm mineraalmarmer mat wit](https://www.maxaro.nl/douches/douchebakken/douchebak-100x100cm-vierkant-mineraalmarmer-mat-wit-10505/) — need to see in person | Maxaro | |
| Shower drain | [Douchegoot 90cm tegel+plaat rooster RVS](https://www.maxaro.nl/douches/douchegoten/douchegoot-met-flensrand-90cm-tegel-en-plaatrooster-rvs-10578/) — tile-style drain (preferred) | Maxaro | |
| Shower screen | | | |
| Bathtub (freestanding) | | | |
| Sink / vanity | | | |
| Faucets | | | |
| Mirror / cabinet | | | |
| Lighting | | | |
| Radiator | _see options below_ | Maxaro | |
| Paint / other | | | |
---
@@ -180,9 +184,12 @@ What should the new bathroom achieve?
### Radiator Replacement
- The existing towel rail radiator on wall D needs replacing. Same position works (vent is above it, plumbing connections are there).
- Size the replacement to the available space: 600mm wide, fitting between the vent above and the 600mm gap to the door below.
- Consider a vertical towel rail if you want more hanging space — a taller, narrower unit could work if the vent position allows it.
- Size the replacement to the available space: 550mm wide fits the wall, 600mm gap to door below, vent at 750mm from wall E.
- With Tado controlling the schedule, the radiator does double duty: room pre-heating and towel warming.
- **Options (matte black, central heating):**
- **[Kepler](https://www.maxaro.nl/radiatoren/handdoekradiatoren/kepler-handdoekradiator-55x174-cm-mat-zwart-1242-watt-aluminium-centrale-verwarming-7056/)** — 550x1740mm, 1242W, aluminium. Tall and powerful. At 1740mm height it would start ~600mm from floor (above door gap) and reach ~2340mm — just under the 2400mm ceiling. Leaves ~60mm clearance. Tight but doable.
- **[Oberon](https://www.maxaro.nl/radiatoren/handdoekradiatoren/oberon-handdoekradiator-55x130-cm-mat-zwart-471-watt-staal-centrale-verwarming-176373/)** — 550x1300mm, 471W, steel. More compact, fits comfortably in the space (600mm + 1300mm = 1900mm, well under ceiling). Lower output — check if 471W is sufficient for the room volume (~11.8 m³).
- **Fit note:** Both are 550mm wide (current radiator is 600mm). The vent is at 750mm from wall E — the Kepler would overlap vertically with the vent position. Confirm whether the vent can sit above the radiator or if there needs to be clearance between them.
### Common Mistakes to Avoid
- Not budgeting for contingency (15% minimum). There are always surprises behind old tiles.